
Roofers and roofing contractors
Find a roofer before the next storm does
Re-roofs, repairs, bedding and pointing, and switching tiles for metal. Roofers on renovate.com.au hold the licence and working-at-heights insurance the job needs.
- Licence checked before listing
- Reviewed by homeowners near you
- Free quotes, no obligation
Services
What roofers on renovate.com.au take on
Before you start
What to know before you get quotes
Repair or replace is a fifteen-year question
If the roof has more than fifteen years left, targeted repairs usually win. If it does not, patching one leak tends to reveal the next. Ask each roofer which way they would go and why.
Metal and tile suit different houses
Metal is lighter and faster to install but louder in rain. Tiles insulate better and match older streetscapes. A change of material may need a structural check of the battens.
Look for the safety setup in the quote
Scaffolding, edge protection or harness points should appear as a line item. If they are missing, the price is missing them too.
Questions to ask
Five things to settle before you sign
- 1Is the quote for repair or full replacement, and why that choice?
- 2What warranty covers the materials, and what covers the labour?
- 3How will you protect the gutters and garden while you work?
- 4What happens if it rains mid-job?
- 5Will you photograph the finished roof so I can see it?
How it works
Three steps, about a minute of your time
- 1
Tell us about the job
Pick the category, describe the work in a sentence and add your suburb. It takes about a minute.
- 2
We match you locally
Licensed builders who work in your area review the job and get in touch, usually the same day.
- 3
Compare and hire
Up to three quotes, with licence details beside each one. Hire the one that suits, or none of them.

Roofers and roofing contractors
Get it quoted this week
Up to three licensed local roofing specialists, free quotes, no obligation to hire.
Questions
Roofing questions, answered
A single-storey home is usually two to five days once materials arrive, weather permitting. Lead time on materials can add a few weeks.